Construct Temporary Storage Structure at NAS Lemoore, CA

Prime Contractor: Jacob Construction & Design, Inc.

Contract Number: N62473-12-R-3411

Contract Value: $190,000.00

Contract Award Date: 09/21/2012

Final Completion Date: 01/28/2012

Agency: NAVFAC SOUTHWEST, Lemoore FEAD, Lemoore, CA

Project Goal

JCD was tasked with constructing a temporary tension fabric structure at Building 210, Hangar 1, Squadron VFA-122 at Naval Air Station Lemoore, CA.

Description

Jacob Construction & Design provided equipment, materials and labor to construct a temporary tension fabric structure at Building 210, Hangar 1, Squadron VFA-122 at Naval Air Station Lemoore, CA. The intended use of the final product was to provide cover and work area for Aircraft Armament Equipment. The scope of work consisted of site work, utilities, paving, temporary structure install, and equipment install.

This project involved

  • Supervision
  • Quality Control management
  • Safety management
  • Environmental management including FOD mitigation
  • Construction of a Temporary Tension Fabric Structure
  • Electrical, utilities, & paving install
  • Performed Best Value Design

Customer Comment

This was the contractor’s second project at Naval Air Station Lemoore. The Contractor’s onsite superintendent has been quick to address, and correct issues brought to their attention by the government and did so in a professional manner. The project was completed ahead of schedule as a result of the contractor’s effective management efforts. I would recommend them for future work.

~Uriel Serna Construction Manager