Replace Pool Recirculation System at Building 901, NAS Lemoore, CA

Prime Contractor: Jacob Construction & Design, Inc.

Contract Number: N62473-11-G-0055

Contract Value: $306,813.00

Contract Award Date: 10/01/2014

Final Completion Date: 03/18/2015

Agency: NAVFAC SOUTHWEST, Lemoore FEAD, Lemoore, CA

Project Goal

JCD was responsible for demolition and installation of a new water recirculation system at the Officer Club’s swimming pool.

Description

JCD was responsible for providing labor, material, equipment, and supervision to demolish and install a new water recirculation system and all accessories at Building 901 (Officer’s Club). The work included the following: demolishing and replacing the pool skimmers, electrical wiring and conduits, electrical controls, pumps, pool light gaskets, filters/accessories, disinfectant equipment, piping, and valves. Given the deteriorating condition of the building, JCD had to adequately prepare the pump room with new doors, air circulation systems, concrete pads, and paint/epoxy to ensure durability of the finished product.

Trades Performed by JCD personnel

  • Supervision
  • Quality Control management
  • Safety management
  • Electrical/Lighting
  • Install new skimmers for pool
  • Prep and paint mechanical building inside and out
  • Epoxy coat floors in mechanical room
  • Core holes/penetrations for mechanical fan install
  • Install mechanical fan and programming for improved air turnover in pump room for purpose of corrosion control and safety for end user
  • Install concrete pad and fencing
  • Make repairs to exterior building fascia
  • Apply site specific Fall Protection for work around drained pool
  • Received Star Safety Award

Trades Performed by subcontractor personnel

  • Demolition of Outdated Equipment/mechanical via Plasma cutting of tanks
  • Installation of new Recirculation System/Components/Plumbing
  • Acid wash pool interior
  • Repair leaks to existing piping relay from pump room to pool