Replace Propane Vaporizer in Buildings 1053 & 7041, MCMWTC Bridgeport, CA

Prime Contractor: Jacob Construction & Design, Inc.

Contract Number: N62473ā€16ā€Dā€0412

Contract Value: $52,172.00

Contract Award Date: 09/29/2016

Final Completion Date: 01/18/2017

Agency: NFEC Southwest, FEAD 29 Palms (MCMWTC Bridgeport, CA)

Project Goal

Jacob Construction & Design, Inc. replaced antiquated vaporizers and all associated plumbing located in buildings 1053 & 7041 at MCMWTC Bridgeport, CA.

Description

JCD performed construction to replace antiquated vaporizers and associated plumbing in Buildings 1053 and 7041. This project began with demolition of existing vertical type Ransom RH200 Series Direct-Fired LP-Gas Vaporizer, plumbing, exhaust pipes. Upgraded system install included a new vertical type Ransom RH 200E Series Direct-Fired Vaporizer with a BTU rating of 200 million BTU/HR and automated controls. During install, JCD proceeded in outfitting the facility with all associated plumbing from new vaporizer unit to liquid propane supply inlet manifold and vapor outlet manifold. Also replaced were the regulators, stacks, burner gas control valves, pilot generators, pilot light assemblies, and vapor temperature switches. Prior to completion, all new equipment and piping were seismically anchored to structure/concrete floor.